2015 - 2020 Road Priorities

At its regular meeting on April 15, 2015 Council adopted the 2015 - 2020 Capital Construction Plan. The plan was compiled to incorporate Council's vision of an interconnected, hard-surfaced road network that meets the needs of the travelling public.

2015 - 2020 CAPITAL CONSTRUCTION PLAN

    START END LENGTH (MILES)
2015        
TWP 492 TERRACEM HWY 855 HWY 854 8
RR 203 OIL TWP 504 TWP 510 2
2016        
ISLET LAKE ESTATES TERRACEM     1.5
RR 205 TERRACEM COUNTY BORDER TWP 502 1
KINSELLA OIL     0.5
TWP 490 TERRACEM RR 130 HWY 36 1
RR 182 OIL TWP 492 HWY 14 6.8
TWP 510 TERRACEM HWY 833 COUNTY BORDER 1.5
RR 201 TERRACEM TWP 510 HWY 14 0.4
RR 182 TERRACEM BLACK NUGGET LAKE TWP 492 0.5
TWP 480 OIL RR 130 HWY 36 1
2017        
TWP 514 OIL HWY 834 HWY 630 6
TWP 512 TERRACEM HWY 834 HWY 630 6
RR 191 TERRACEM TOWN OF TOFIELD TWP 512 0.5
2018        
TWP 492 TERRACEM HWY 834 HWY 854 8
TWP 504 OIL HWY 833 RR 205 4
2019        
RR 202 OIL TWP 502 TWP 510 4
TWP 480 TERRACEM HWY 14 RR 143 6.8
TWP 502 OIL HWY 833 RR 203 2
2020        
TWP 480 TERRACEM RR 143 HWY 857 3
RR 130 TERRACEM HWY 619 TWP 480 1
TWP 502 OIL RR 203 RR 205 2
TWP 480 TERRACEM HWY 857 RR 154 4