Shoulder pull on Twp 462 & Rge Rd 130 is ongoing

Construction crew is currently preparing 51 Ave in Holden for cement to be poured on September 8. (Weather permitting)

Culverts are being replaced and installed throughout the County

Dozer work on Rge Rd 142 south of Twp 492 is ongoing