Back to News Listing
CN Railway Track Closures
During the the new track construction, CN railways will close the following crossings on the following days. The estimated duration per closure is between 12-14 hours depending on machine performance. Every attempt will be made to minimize the length of closures.
August 14 - RR192 6 am start
August 15 - RR193 7 am start
August 16 - RR194 8 am start
There is the potential for both RR193 and RR194 to be done in the same day.